Styles Façade Solutions® (formerly Thomann-Hanry®) was instructed by Gore Property Management Ltd to restore the painted stucco façade and metal railings of 25 Kensington Gore. As a leading London heritage painting contractor, we completed the work without erecting any scaffolding.
Working from Mobile Elevating Work Platforms (MEWPs), our team inspected, prepared and redecorated this Grade II listed building, testing all surfaces for lead-based paint in line with CLAW regulations.
Over eight weeks, we applied more than 835 litres of paint across 10,000 m² of stucco, railings and window frames, handing the building back the day we finished.
Solutions provided
REVIVING A KENSINGTON LANDMARK
Prior to the construction of 25 Kensington Gore, its site lay within the Gore House Estate, next to the Brompton Park Nursery. This patchwork of market gardens and plant nurseries was once run by the celebrated royal gardener Henry Wise. Following the Great Exhibition of 1851, the Royal Commission purchased the Estate and surrounding lands to create a new cultural quarter, soon to be nicknamed “Albertopolis”.
With the old Estate buildings cleared by the late 1850s, the plot remained vacant until it was leased for residential development in the early 1870s. The mansion that rose there was designed by the architect Samuel Whitfield Daukes for the banker Samuel Montagu. It soon passed to Albert Sassoon, later created 1st Baronet of Kensington Gore, who had moved his family’s vast trading empire from India to London in 1875.
After the First World War, like many grand Victorian mansions, the building became too expensive to run as a single-family home, and the property fell into commercial and institutional ownership. The property gained Grade II listed status in 1970. In 1985 the property and lease were sold to a private property company, which oversaw significant internal and external restoration works and added modern amenities, including a basement swimming pool, gym and roof garden. Following the restoration, the property returned to use as a single-family residence via corporate ownership. Today, in partnership with Historic Houses, it opens its state rooms for a small number of pre-booked guided tours, a rare chance to see inside one of Kensington’s grandest homes.
The Scaffold-Free London Heritage Painting Contractor
With the building’s painted stucco façade and metal railings in need of redecoration and restoration, Gore Property Management Ltd instructed Styles Façade Solution® to help return the building to its original glory. As a leading London heritage painting contractor, we were able to start work without the need to erect a single pole of expensive, time-consuming and unsightly scaffolding.
Using Mobile Elevating Work Platforms (MEWPs), the team was able to inspect, prepare and carry out the redecoration works on this impressive Grade II listed building, in the heart of one of the most luxurious residential areas in London, without enveloping the building in scaffolding for months on end.
As part of the façade inspection and preparation works, we tested all façades, windows and railings for lead-based paint in accordance with the Control of Lead at Work Regulations 2002 (CLAW), to ensure we kept our team, the client and the wider public safe.
10,000 m² of Stucco in Eight Weeks
With over 10,000 m² of lime-based stucco render to paint, the eight-week project required over 700 litres of paint to complete the façade, 90 litres of Metalshield paint for the intricate work on the railings and over 45 litres for the window frames.
With the final lick of paint applied, the project was complete. Working from MEWPs meant that, as a London heritage painting contractor, we could conclude works on the property, clean and tidy the site and hand it back to the client on the same day. Thanks to our dedicated team of heritage decorators and restorers, the fully refurbished historic property will be ready to impress for years to come.
“We’re delighted with the results at 25 Kensington Gore. Restoring a Grade II listed building of this calibre is a privilege, and our team rose to the challenge brilliantly. By working entirely from MEWPs, we avoided months of scaffolding, kept disruption to a minimum and handed the building back on the day we finished. It’s exactly the kind of heritage project we’re proud to deliver.”
Mark Styles, Managing Director, Styles Façade Solution
See the links below for more examples of the results Styles Façade Solutions® can deliver for your business.